Back to the projects

Prolemn S.A.

Place Reghin - Romania
System Configuration Siemens S7 400 PLC, and WinCC V7.0 SCADA package
Description Tempa Sistem did provide the complete MCC,PLC Panels, The Automation System to control more than 600 Input / Output control process signals. The total system is monitored and controlled by WinCC SCADA.Computer Monitoring Station installed in the control room.
Date 2009